Index  /  Shop floor  ·  ECO-001  ·  Engineering Change Order

Two Sheets Added — the Procedure and the History

AI & Collaboration · August 22, 2026

SHEET 10 and SHEET 11 issued. The AI section grows from positions to procedure to history — how I actually work with the machine, and the era-by-era log of what poking it taught me.

Doc no.TypeDateCategoryReferences
ECO-001Engineering Change OrderAugust 22, 2026AI & CollaborationSHEET 10, SHEET 11

Reason for change: the AI & Philosophies sheet said what I believe, but not what I do, and not how any of it got this way. Two gaps, two sheets.

SHEET 10 — Working With AI is the procedure. Three seats at the bench — Architect, Documenter, Implementor — with a spec table for who owns what and who is barred from what. Spec before code. Diagnosis before fix. And the standing rules, every one of which was drafted mid-argument and earned its place by recurring.

SHEET 11 — Timeline of the Black Box is the history, told in eras rather than dates: poking the box, mining my own tailings, the box agreeing too much, the amnesia getting a name, the contract drafted in friction, building the logbook, and the box poking back. It ends where the work currently stands: the box never opened, but everything around it is instrumented.

Disposition of existing sheets: SHEET 08 (AI & Philosophies) unchanged except for cross-references to the two new sheets. All other sheets unaffected.

Verification: both sheets built, linked from the index, and field-checked by the only inspector this shop has.

← Shop floorOlder: AN-005 →